WEST PARK SCHOOL

Brief:  SGM were tasked with undertaking the majority of the structural engineering elements of this £2.4 million scheme.

The new classroom block has been designed as a steel frame on piled ground beams. The building also incorporated a ramp from an upper level outside into the first floor. The works were undertaken by ‘Derwent Valley Construction’ and the building was designed by ‘Provizion First Architecture’.

Click on an image below to view a larger version of it.

Steel frame
Steel frame
Steel frame, metal deck, concrete pour