WEST PARK SCHOOL
Brief: SGM were tasked with undertaking the majority of the structural engineering elements of this £2.4 million scheme.
The new classroom block has been designed as a steel frame on piled ground beams. The building also incorporated a ramp from an upper level outside into the first floor. The works were undertaken by ‘Derwent Valley Construction’ and the building was designed by ‘Provizion First Architecture’.